Commissioning & calibration
On-site boom leveling, nozzle chart setup, pressure band checks and rate-controller verification before the opening spray pass of the 2026 season window. Includes a written calibration record with water volume, travel speed (km/h) and target L/ha, typically reviewed inside a ±5% band before product is loaded.
- Boom height and section valve checks
- Nozzle wear sampling across the boom
- Controller I/O and speed sensor confirmation